Caple C813C Manual do Utilizador Página 15

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 22
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 14
STEP 9 (See Diagram 9 & Cable Loop Diagram)
A.) Attach the136” Bench Press Cable (#34) to the open slot on Pulley Cable Hanger (#45)
previously installed in Step 8.
B.) Pull the Cable downward to the open bracket on top of the Base Frame (#1). Install a Pulley
(#79). Secure it with one M10 x 2” Allen Bolt (#98), two ¾” Washers (#114), one U-
Shaped Bracket (#87), and one M10 Aircraft Nut (#112).
C.) Pull the Cable upward to the Single Floating Bracket (#20) previously installed in Step 7E.
Install another Pulley.
D.) Draw the Cable downward to the bracket on the back of the Front Vertical Beam (#3). Install
a Pulley. Then pull the Cable through the opening to the Front Press Base (#7). Install Two
Pulleys side by side to each other. Insert a M10 x 9 ¼” Axle (#59) through the holes.
Secure the Axle with two 3/4” Washers (#114) and M10 Aircraft Nuts (#112).
E.) Draw the Cable around the first Pulley then back to the bracket on the Front Vertical Beam.
Install another Pulley. Draw the Cable back to the Base (#7) to the second Pulley.
F.) Pull the Cable around the second Pulley then back to the bottom bracket on the Front
Vertical Beam. Secure the Cable end to the bracket with one M10 x 1” Allen Bolt (#101), two
¾” Washers (#114) and one M10 Aircraft Nut (#112).
DIAGRAM 9
14
Vista de página 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 21 22

Comentários a estes Manuais

Sem comentários