Caple C602E Manual de Instalação Página 19

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 40
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 18
Revision 1.9 - 19 -
5.3
Liftgate basic power connection and battery cable routing
12 Volt Control power needs to be connected to operate the “Down Function” and release pressure at the
lift cylinders to get lift arm in correct location (see Figure 13 and Figure 14)
7
0
0
ø 39-13/16"
7
0
0
Figure 12 Power cable routing on passenger side
- The positive cable is already prewired along the tube towards the passenger side to join the ground-
and control switch cables on curb side.
- The wiring loom is coiled up with the gate delivered. Run the cable loom to inside of the frame like
shown in Figure 12.
- Make sure the cable loom gets anchored to the inside at the cross member that is half way of the slide
rail, so that the cable loom is the same length when in stored and in operating position.
- Slide gate in and out several times to assure that the wiring loom is not catching any parts and get
ripped apart. If wire loom breaks, power cable might shorten out to frame.
- On trailer installations, you will have a trailer battery kit installed on the driver side. In this case you
only have the 7-way plug cable in the loom. Route the loom the same way like shown above.
Wire loom, connected along rod with
rings and routed inside frame to front
of truck/trailer
Vista de página 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 39 40

Comentários a estes Manuais

Sem comentários